Skip to main content
Permit rules
All calculators
Free takeoff

Deck calculator: joists, beams, decking and cost

Deck framing is where estimating and structure collide. Joist spacing sets your board count, your hanger count, your fastener count and whether the finish surface feels solid underfoot — so it is worth resolving before you price anything else.

Enter footprint, framing species, spacing and decking type, and the takeoff returns framing members, footings, hangers, boards and fasteners with a span check that flags any joist or beam outside standard span tables. It is a planning aid, not a stamped design; loaded, elevated or roof-covered decks should be reviewed locally.

Estimates only — not a quote.

Open the deck builder
What you get

Included in the takeoff

  • Joist, beam, post and footing counts
  • Decking board count at your width and gap, with waste
  • Hanger, hardware and fastener quantities
  • Span check against IRC-style tables
  • Stair stringer and railing components
What it asks for

Inputs

  • Deck length, width and height above grade
  • Framing species and joist spacing
  • Decking material, board width and gap
  • Stair count and railing style

Common deck sizes, calculated

Quick answers for the sizes people search most. Your yard will differ — enter your own numbers for a plan that fits.

SizeJoistsDecking boardsFootingsConcrete bagsEst. materials
10×10 ft925630$2,118
12×12 ft1029630$2,376
16×12 ft1358630$3,247
20×16 ft3277840$4,562

How these numbers work: Assumes an attached pressure-treated deck 3 ft off the ground, joists 16" on center, 12 ft decking boards, railings, 4 stair risers and 10% waste. Board counts round up, so you never come up short on install day. National average prices before your ZIP is applied. Estimates only, never a quote.

How to plan it

Plan it in 5 steps

  1. 1
    Fix the footprint

    Square the outline and confirm it clears setbacks and any easement. The footprint drives every quantity that follows.

  2. 2
    Choose spacing before material

    Composite and diagonal patterns often need 12-inch centers. Set spacing first, then price boards.

  3. 3
    Run the span check

    Confirm your joist and beam spans sit inside the table for your species and size before ordering lumber.

  4. 4
    Plan footings for your frost line

    Footing depth is local. Look it up for your address; it changes concrete volume noticeably.

  5. 5
    Price two decking options

    Run the same frame with pressure-treated and composite decking to see the real delta before you decide.

Planning guidance only. Every quantity and price is an estimate — confirm dimensions and local requirements before you buy or build.

Run your own numbers

Enter your dimensions and get a material list, cut list and regional cost estimate in a couple of minutes. No account needed to see the takeoff.

Start estimating
For contractors & trades

Bidding deck builder work for clients?

Contractors and handymen run this deck builder to build the material takeoff, nest the cut list, check permits by ZIP and hand the client a branded proposal — same visit, before the estimate goes cold.

  • Takeoff priced to your ZIP in minutes
  • Cut list that trims the lumber order
  • Branded proposal and invoice PDFs

Material and cost output is an estimate, never a quote. Permit content is guidance to verify with your local building department.

Frequently asked questions

Keep planning

Not sure where to start? Browse every calculator